The expansion works of the substation automation system for Edelnor’s Chillón Substation (220/60/20 kV) were concluded in the second quarter of 2011. The scope of expansion considered the 60 kV line.
The scope of supply included an automation system, based on CLP 500SAS, integrating Efacec bay control units (BCU 500) and third party protections. The integration of all components was done in accordance to IEC 61850.
This substation is already in operation, since the end of 2008, and the original automation system was also supplied by Efacec.
|